Mining project decisions

Continuity between lifecycle project models and post-decision commercial control.

Case studies for mining companies

APPLICATION

CLIENT SPECIFIC REQUIREMENTS, ADDITIONAL REQUIREMENTS, DATA INPUTS AND RESULTS, DELIVERABLES, IMPLEMENTATION

This model was originally developed for one of the majors that employed contract mining methods on a mine in East Africa during a process of replacing contract mining with owner mining methods.

CLIENT SPECIFIC REQUIREMENTS


●  Owner mining model using both existing and new mining equipment.

●  Owner mining model to provide for comparisons between diesel and diesel-electric mining equipment.


ADDITIONAL REQUIREMENTS


●  Mineability assessment of existing status qou.

●  Technical and operational support to re-engineer for best mining practices – 3 years.

●  Fleet selection and equipment requirements with capable production output using the Clients production schedule.

●  Assist with compilation of a new production schedule using the model results.

●  Incorporate the Clients historical mining costs and generate new budget forecasts.

●  Compile a complete owner mining model with capital and operating cost breakdowns split into MARC and owner maintenance cost estimates for the LOM.


DATA INPUTS AND RESULTS


●  Geological models, mine engineering and designs, production schedules, equipment employed by contractor.

●  Historical productions and KPI’s.

●  Results applied to assist during the change over from contract to owner operator mining.


DELIVERABLES


●  Priced BOQ with same structure as tender for ease of cost comparisons.

●  Unit rate price makeup / breakdown.

●  Cost breakdown split into capital (owning) and operating cost.

●  Owner mining, new equipment models for Caterpillar, Komatsu and Liebher.

●  Unit rates resource makeup, resource analysis and utilisation.

●  Production (quantity forecasts).

●  Budget forecasts.


IMPLEMENTATION


●  Project lifecycle - LOM

●  Implementation – by Client