Construction and contracting solutions
Construction and contracting solutions
Following on from our previous article "Mining the Geological Structure: A Path to Optimise Resource, Reduce Dilution and Improve Grade Introduction" this article focusses on how Tacmin Construction can improve grade extraction by intoducing geological structure mining into your operations.
Primary objectives
The primary objective of implementing geological structure mining is to enhance ore extraction efficiency, minimise dilution, and improve grade quality. This not only boosts profitability but also prevents the devaluation of the mineral resources. Simultaneously, it aims to reduce operations costs along the ore supply chain and optimise processing expenses, creating a more profitable, cost-effective and efficient mining operation.
Achieving objectives through strategic focus
The objectives are achieved through a strategic focus that aims to achieve the desired results through a selective ore mining method based on a bottom-up mine design, appropriate sizing of ore mining equipment, optimising bench designs for optimal equipment performance, and adjusting drill and blast design to suit those above.
Concurrently with ore grade extraction, we optimise ore supply chain operations from pit to port. This is achieved through a comprehensive approach to planning, coordinating, and monitoring all the activities and processes through an effective grade control program. Such a program covers all areas from the extraction of ore from the mine (pit), ore supply, processing, transportation, and ore handling operations at the port.
The goal is to maximise efficiency, reduce costs, and ensure a steady supply of high-quality on spec ore to meet market demand. It requires the integration of advanced technologies, data analytics, and best practices in supply chain management.
Adobting best practices during execution
Based on tried and tested experience gained on several mines, Tacmin Construction adopts best practices for mining companies that want to implement the geological structure mining method. The primary focus areas are:
Method of engagement
Tacmin Construction’s approach to introducing and implementing the geological structure mining solution for our clients is achieved through project management as detailed in the services section of our website. The process of gathering information, understanding and compiling the scope of work, its magnitude, and cost to the client is conducted in line with our preconstruction process, at previously agreed consultancy rates.